Roof Replacement Cost Estimator

Build an itemised, illustrative roof replacement budget from your own material, labour, tear-off, disposal, permit and contingency figures.

  • Runs in your browser
  • Free, no sign-up
Roof
Units

20 squares. Use the roofing material calculator if you only have the footprint.

Example value, replace with your own

Your prices

Enter figures from supplier and contractor quotes. The starting values are examples, not market prices.

Example value, replace with your own

Example value, replace with your own

Example value, replace with your own

Example value, replace with your own

Check your local building authority

Reserve for surprises such as rotten decking

Results

Illustrative total
$10,010
Including $910 contingency
Cost per square
$500.50
$5.01 per sq ft
Materials (incl. waste)
$3,300
Installation labour
$4,000
Tear-off (1 layer)
$1,000
Disposal
$500
Permits
$300
Extras
$0
Contingency (10%)
$910
Subtotal before contingency
$9,100
Total
$10,010

Materials are priced on 22 squares (area plus waste). Labour and tear-off are priced on the roof area without waste.

Illustrative estimate, not a quote

This estimate is only as good as the prices you enter. A contractor's written quote after inspecting the roof is the only reliable figure; hidden damage, access, roof complexity and local rules can change the cost considerably.

This calculator produces an estimate from the figures you enter. It is not financial, tax or legal advice.Full disclaimer

How to use the roof replacement cost estimator

  1. Choose units and enter the sloped roof area (use the roofing material calculator if you only have the footprint).
  2. Enter material and labour prices per square or per m² from your quotes.
  3. Enter the number of existing layers to remove and the tear-off price per layer.
  4. Add disposal, permits, extras and a contingency percentage.
  5. Review the itemised breakdown and download it as CSV or print it.

Worked example

2,000 sq ft roof, 10% waste, example prices

With example prices of $150 per square for materials, $200 per square labour, one layer of tear-off at $50 per square, $500 disposal, $300 permits and 10% contingency: materials 22 squares × $150 = $3,300; labour 20 × $200 = $4,000; tear-off $1,000; subtotal $9,100; contingency $910; total $10,010 ($500.50 per square). These prices are placeholders, not market rates.

How it works

Imperial billing units are squares (area ÷ 100); metric uses m². Materials = units × (1 + waste) × material price. Labour = units × labour price. Tear-off = units × layers × price per layer. Subtotal = materials + labour + tear-off + disposal + permits + extras. Contingency = subtotal × contingency %. Total = subtotal + contingency.

Assumptions

  • Every price (materials, labour, tear-off, disposal, permits, extras) is entered by you. The starting values are placeholders, not market prices.
  • Waste applies to materials only; labour and tear-off are priced on the roof area without waste.
  • Contingency percentage is your own choice.
  • Switching units converts prices at 1 square = 9.2903 m².

Frequently asked questions

Is this a roofing quote?

No. It is an illustrative budget built from the prices you enter. Only a contractor who has inspected the roof can quote, because hidden damage, access and roof complexity affect the price.

Why include a contingency?

Rotten decking, extra layers or flashing repairs are often found only once the old roof is removed. A contingency keeps the budget realistic.

Where do I get prices?

Ask at least two or three local roofers for itemised written quotes, and ask suppliers for material prices for your chosen product.

Limitations

  • Does not model steep-roof or height surcharges, structural repairs or financing.
  • Illustrative estimate only; not a quote or a price guide.